← Back

Setup · 7 min

Documenting a CNC job setup

Worked setup record: stock, datums, tools, operations and first-part inspection.

Worked setup record: stock, datums, tools, operations and first-part inspection.

Recovering a program does not recover the setup. A setup sheet records what was clamped, the physical datum, the real tools and the checks performed. Its value is in decisions that the next shift can verify.

Identify the job and its scope

Record part reference, drawing revision, material, supply condition, stock and batch quantity before cutting data. Keep program revision separate from drawing revision: a tolerance change may require a new process even when the apparent shape is unchanged. Teaching example: 20 bushes, reference C-014, drawing Rev. B; round stock Ø55 × 65 mm, final length 60 mm. Acceptance dimensions and tolerances must come from the approved drawing. These example dimensions do not define a complete manufacturable component.

Describe a checkable setup

Record chuck jaws or collet, supporting surfaces, grip length, protrusion and the physical reference used for Z0. An authorized photo can supplement this information but cannot replace dimensions and fixture identification. For example: “Z0 on the faced surface of the first setup; X in diameter mode”. Avoid “usual zero” or “same jaws”. Add the verification method and the person responsible for validation.

Connect station, offset and actual tool

Turret position alone does not identify a tool. Record station, control-specific offset designation, holder, insert or solid tool, applicable radius and overhang. Check whether the T command calls position and offset together or separately. For the example bush, distinguish external turning, drilling and boring. Their final sequence depends on the drawing and clamping. Copying the example without validating tools, paths and loads does not prove suitability.

Define first-part acceptance

For each critical dimension, record tolerance, instrument, suitable resolution and measurement stage. Record thermal conditions when expansion matters. Check the first part against the workshop control plan before releasing the batch. Leave room for the measured value, applied correction and subsequent result. Temperature- or setup-dependent deviations may indicate a process issue rather than a wear correction. Set sampling frequency according to risk, tolerance and observed stability.

Close the record after production

Retain setup time, time per part, incidents and reasons for changes. Record the validated final condition, not only the intended setup. Before handover, check matching job identifiers and revisions, verifiable datums and tools, first-part results, measured versus estimated times and recorded changes. The linked preparation sheet is available in this language: it groups these fields and estimates a batch from your times. Print the approved version or save a PDF before closing; entered values are not saved automatically on reload.

Fillable and printable CNC setup sheet →